08.08.2018

MCH 13,16 & 18 – NEW - SECOND STAGE VALVES

We have introduced an important upgrade to the second stage of the MCH 13, 16 and 18 pumping units, replacing the intake and drain valves, (previously made of galvanized steel) with new valves entirely made of stainless steel.

This upgrade increases the duration of the valve life and in turn gives a longer life to the entire pumping unit.

  • let's stay in touch

    Sign up to our newsletter

  • SIGN UP